> Table 9-4. Operator lnterface Instrumentation Requirement. (Continued)
Table 9-4. Operator lnterface lnstrumentation Requirements. (Continued) - ufc_3_430_02fa0124
Chapter 10. Electric Systems
Central Steam Boiler Plants
Page Navigation
121
122
123
124
125
126
127
128
129
130
131
TM
5-810-15
Table 9-4.
Operator
lnterface
Instrumentation
Requirement.
(Continued)
ACFB
Fired
Boilers
Integrator
Equipment
Start-Stop
Controls
1.
Steam
flow
R
1.
ID
fans
R
2.
Fuel
flow
R
2.
FD
fans
R
3.
Feedwater
flow
R
3.
PA
fans
R
4.
Sorbent
flow
R
4.
Boiler
feed
pumps
R
5.
Coal
feeders
R
6.
Sorbent
(
limestone
)
feeders
R
7.
-valve
blowers
R
R -
Required
X - Optional
9-28