UFC 3-430-07
24 July 2003
including Change 1, Jan 2004 and Change 2, March 2005
8-2
CONTRACTOR REPAIRS................................................................. 28
8-3
SETTING SAFETY AND RELIEF VALVES ....................................... 28
8-4
RECORDS......................................................................................... 28
CHAPTER 9 INSPECTION CERTIFICATES AND REPORTS
Paragraph
9-1
PROCEDURES FOR SUBMITTING REPORTS AND FORMS......... 29
9-1.1
Inspection Reports Boilers and Unfired Pressure Vessels ............ 29
9-1.2
Inspection Certificate for Boilers Unfired Pressure Vessels ........... 29
CHAPTER 10 MAXIMUM ALLOWABLE WORKING PRESSURE
Paragraph
10-1
GUIDANCE........................................................................................
30
10-2
STANDARD BOILERS ......................................................................
30
10-2.1
Standard Watertube Boilers...............................................................
30
10-2.2
Standard Cast-Iron Steam Boilers .....................................................
30
10-3
NONSTANDARD BOILERS ..............................................................
30
10-3.1
Nonstandard Riveted Boilers .............................................................
30
10-3.2
Nonstandard Welded Boilers .............................................................
30
10-3.3
Nonstandard Cast-Iron Boilers ..........................................................
30
10-4
CALCULATIONS OF MAXIMUM ALLOWABLE WORKING
PRESSURE .......................................................................................
31
10-5
FACTOR OF SAFETY .......................................................................
31
CHAPTER 11 MISHAP OR PROPERTY DAMAGE REPORTING
Paragraph
11-1
REPORTING REQUIREMENTS ....................................................... 32
11-2
INFORMATION COPIES ................................................................... 32
APPENDIX A
REFERENCES ........................................................................................ 33
APPENDIX B
THE NAVFACENGCOM BOILER AND PRESSURE VESSEL INSPECTION
PROGRAM: QUALITY ASSURANCE ORGANIZATION ......................... 35
APPENDIX C
DUTIES AND QUALIFICATIONS OF THE SENIOR INSPECTORS....... 36
APPENDIX D
PROCEDURES FOR LAY-UP OF BOILERS .......................................... 37
APPENDIX E
REPORTS AND FORMS......................................................................... 39
APPENDIX F
PMI CHECKLIST FOR SMALL BOILERS ............................................... 47
APPENDIX G
WHAT TO EXPECT WHEN THE BOILER INSPECTOR CALLS ............ 51
INDEX
INDEX...................................................................................................... 59