MIL-HDBK-1003/13A
WORKSHEET A
Job Summary
Date______________________
Job Number____________________
Building________________________
General Construction__________________
Location________________________________________________________________
Occupancy___________________________ Hours of Occupancy_________________
Type of Solar System____________________________________________________
Building Area____________sq ft
No. BR____________
No. Baths_______
Fuel______Burned in__________@_________% assumed @ Cost_______/106Btu
efficiency
______
__________@_________%
_______/106Btu
______
__________@_________%
_______/106Btu
Solar Collector Description:____________________________________________
____________________________________________
Approx. Cost, installed, total system
$_______/sq ft DHW
(Worksheet F)
 (1)  
(x)  
(y)
_  
 Area 
f    Solar  Value of 25 year   Savings/  Payback Period  
(From (From  System 
Fuel Saved
 Investment (NAVFAC Manual  
 E-1)  E-1)   Cost  
(From E-1 -
Ratio  
P-442)
(From F)
column (9)
(y)/(x) 
Or E-2)
119