MIL-HDBK-1003/13A
WORKSHEET A
Job Summary
Date
Nov 1979
Job Number
Example 1
Building
General Construction
Stucco
Location
Port Hueneme, California
Occupancy
Family of Four
Hours of Occupancy
Type of Solar System
Space and DHW
Building Area
1,467
sq ft
No. BR
3
No. Baths
2
Fuel Gas  Burned in  Heater  @
70
% assumed @ Cost .30 /106Btu
 
efficiency  
@
%
/106Btu
 
@
%
/106Btu
 
Solar Collector Description:
Single glazed glass, Copper absorber,
Selective coating
Approx. Cost, installed, total system
$
/sq ft DHW
(Worksheet F)
 (1)  
_  
(x)  
(y)
 Area 
f    Solar  Value of 25 year   Savings/  Payback Period  
(From (From  System 
Fuel Saved
 Investment (NAVFAC Manual  
 E-1)  E-1)   Cost  
(From E-1 -
Ratio  
P-442)
(From F)
column (9)
(y)/(x) 
Or E-2)
  200  .646   8,020 
12,094
1.51
- 18 years
  300  .794  12,030 
14,865
1.24
- 22 years
133