> Figure 4-16. TL Requirement for Noise From Engine Room No. 1 to Control Room (DD From 2298)
Figure 4-15. Room Constant Estimate for the Control Room (DD From 2295)
Figure 4-17. TL Requirement for Noise From Engine Room No. 2 to Control Room (DD From 2298)
Power Plant Acoustics - index