Table 1 (Continued)
Factors for individual Facilities By Navy Category Code[1]
DEMAND
LOAD
NAVY
FACTOR FACTOR
CODE
DESCRIPTION
(%)
(%)
843 20
Fire protection pumping station . . . . . . . . . . Do not include
-operate for
test off peak.
890 20
Compressed air plant . . . . . . . . . . . . . . . .45-50
25-30
890 42
Air-conditioning plant, . . . . . . . . . . . . . . .60-70
25-30
Miscellaneous Operational and Training Facilities:
125 10
POL pipeline . . . . . . . . . . . . . . . . . . . .
132 10
46-..
Miscellaneous Facilities for Ship Repair and
Shipbuilding . . . . . . . . . . . . . . . . . . . .
Ship repair shops:
213
41
Central tool shop - (06) (E). . . . . . . . . . . .32-37
23-28
213
42
Shipfitting shop - (11) (A) . . . . . . . . . . . .22-27
24-29
213
43
Sheet metal shop - (17) (B) . . . . . . . . . . . .10-15
15-20
213
44
13-18
213
49
Inside machine shop - (31) (G). . . . . . . . . . .16-21
21-26
213
53
Boiler making shop - (41) (D) . . . . . . . . . . .12-17
14-19
213
54
Electrical shop - (51) (M). . . . . . . . . . . . .33-38
20-25
213
55
Pipefitting shop - (56) (J) . . . . . . . . . . . .22-27
17-22
213
56
Woodworking shop - (64) (R) . . . . . . . . . . . .25-30
21-26
213
59
Abrasive blast facility . . . . . . . . . . . . . .30-35
10-15
213
60
Paint and blasting shop - (71) (S). . . . . . . . .50-55
23-28
213
61
Riggers shop - (72) (T) . . . . . . . . . . . . . .50-55
20-25
213
62
Sail loft . . . . . . . . . . . . . . . . . . . . .35-40
20-25
213
63
Foundry - (81) (K) . . . . . . . . . . . . . . . .35-40
22-27
213
64
Patternmaking shop - (94) (X) . . . . . . . . . . .28-33
12-17
213
67
Pumphouse, drydocks . . . . . . . . . . . . . . . . 75-80 0.1-0.2
Miscellaneous Facilities for Naval Ordnance
Manufacture:
226
Ammunition components building . . . . . . . . . . .15-20
20-25
226
Manufacturing . . . . . . . . . . . . . . . . . . . .30-45
17-32
226
Explosive loading . . . . . . . . . . . . . . . . . .65-70
25-30
226
Miscellaneous explosives storage and handling . . . .65-70
5-10
226
Assembly building . . . . . . . . . . . . . . . . . .40-50
20-25
226
Detonator building . . . . . . . . . . . . . . . . .65-70
20-25
226
Pelleting . . . . . . . . . . . . . . . . . . . . . .40-50
20-25
226
Plastic beading . . . . . . . . . . . . . . . . . . .55-60
18-23
226
Sewing room . . . . . . . . . . . . . . . . . . . . .35-40
25-30
226
Projective assembly breakdown . . . . . . . . . . . .55-60
18-23
226
Machine shop . . . . . . . . . . . . . . . . . . . .16-21
21-26
226
Phosphorous plant . . . . . . . . . . . . . . . . . .35-40
25-30
226
TNT detonator (military) . . . . . . . . . . . . . .35-40
15-20
226
Ammunition tank box assembly . . . . . . . . . . . .35-40
15-20
226
Box emptying . . . . . . . . . . . . . . . . . . . .35-40
15-20
1Demand factors include allowance for system loss.
8