MIL-HDBK-1025/10
PAGE
23
Temporary Ground Rod Minimum Requirements .................................. 35
24
Substation Protective Grounding Procedure .......................................... 37
25
Grounding of Substation Equipment...................................................... 38
26
Grounding of Equipment During Oil Handling....................................... 39
27
Procedures for Grounding Insulated and Uninsulated Aerial Lift
Trucks ............................................................................................... 40
28
Stringing/Removing Conductor Ground Locations ................................ 41
29
Conductor Ground Location After Pulling............................................. 42
30
Categories of Electrical Line Maintenance Work ................................... 43
31
Approved Energized Work Methods by Voltage Class .......................... 44
32
Insulating Tools for Electrical Workers ................................................. 45
33
Common Classification for Plastic Guards ............................................. 45
34
Insulating Plastic Guards/Platforms for Electrical Workers .................... 46
35
Prework Procedures .............................................................................. 46
36
Energized Work Precautions ................................................................. 47
37
Voltage Level Work Procedures............................................................ 47
38
Average Size of Crew Required to Raise Poles of Different Lengths
by Piking........................................................................................... 77
39
Shore-to-Ship Electrical Connect Responsibilities................................ 127
40
Shore-to-Ship Electrical Disconnect Responsibilities ........................... 127
PAGE
A.
Electrical Connection Outlet Assembly With a 15-kV Receptacle ............... 129
B
Inside a Pier Vault Housing a Substation .................................................... 129
C
A Skid-Mounted Substation ....................................................................... 130
D
A Skid-Mounted Substation With Camlock Connections ............................ 130
E
A 480-Volt Pier Electrical Outlet Assembly Without Cable Connections..... 131
F
A 4.16-kV Pier Electrical Outlet Assembly and Outlets .............................. 131
G
A 480-Volt Pier Electrical Outlet Assembly And Cable Connections........... 132
H
A 480-Volt Shore-Cable to Ship-Cable Splice Connection in Place ............. 132
I
A 480-Volt Shore-Cable to Ship-Cable With Camlock Connection ............. 133
J
A 480-Volt Shore-Cable to Ship-Cable Plug and Receptacle Connection
in Place ................................................................................................... 133
K
A Cable Being Reeled by a Boom Truck..................................................... 141
L
Cable Protection Safety Barricades............................................................. 142
M
Effective Vault Rescue ............................................................................... 142
............................................................................................153
xv