Home
Download PDF
Order CD-ROM
Order in Print
Home
>
United Facilities Criteria CD 2
>
> Navy and Marine Corps Intranet (NMCI) Standard Construction Practices - index
Navy and Marine Corps Intranet (NMCI) Standard Construction Practices - index
Navy and Marine Corps Intranet (NMCI) Standard Construction Practices - ufc_3_580_100001
Unified Facilities Criteria (UFC) - ufc_3_580_100002
Foreword - ufc_3_580_100003
Contents - ufc_3_580_100004
Contents - Cont'd - ufc_3_580_100005
Figures
Tables - ufc_3_580_100007
Chapter 1 Introduction - ufc_3_580_100008
Order of Precedence - ufc_3_580_100009
Chapter 2 General Conditions New Construction
Figure 2-1 NMCI Network Architecture (Simplified)
Entrance Facility (EF)
Location - ufc_3_580_100013
Table 2-1 NMCI POP Facilities
Table 2-2 NMCI MC Cabinet Requirements
Telecommunication Rooms (TR)
Table 2-3 TR Size Requirements
Figure 2-2 Wall-Mounted or Floor mounted Cabinet
Outside Cable Plant
Inside Cable Plant - ufc_3_580_100020
Cable
Figure 2-3 Typical 1V+1D Wall Plate Configuration
Classified Network Requirements
Chapter 3 NMCI Conversion Process
Coordination - ufc_3_580_100025
Navy Facilities Engineering Commands
Phase 1 - Preparation
Preliminary Site Questionnaire
Initial Facilities Briefing
Phase 2 - Joint Assesment/Survey
Phase 3 - Detailed Survey and Design
Phase 4 - Implementation
Phase 5 - Completion
Chapter 4 Special Considerations During the Conversion Process
Inside Cable Plant - ufc_3_580_100035
Wall Jacks and Cable\
Interior Facilities
Fire Protection - ufc_3_580_100038
Appendix A References - ufc_3_580_100039
Non-Government Publications - ufc_3_580_100040
Non-Government Publications - cont'd - ufc_3_580_100041
Appendix B GLossary - ufc_3_580_100042
Appendix B GLossary - Cont'd - ufc_3_580_100043
Appendix B GLossary - Cont'd - ufc_3_580_100044
Appendix B GLossary - Cont'd - ufc_3_580_100045
Appendix B GLossary - Cont'd - ufc_3_580_100046
Figure B-1 Single Line Drawing of EIA/TIA Facility/Function Terminology
Appendix C Supplementary Technical Guidance
Table C-1 Minimum Uniformly Distributed Live Loads and Minimum Concentrated Live Loads
Table C-2 NMCI Minimum Loads
Figure C-1 Scope of TIA-J-STD-607 for Large Commercial Buildings
Figure C-1 Scope of TIA-J-STD-607 for Large Commercial Buildings - Cont'd
Figure C-2 Non TIA-J-STD-607 Compliant Building
Mechanical
Design Conditions - ufc_3_580_100055
Design Conditions - cont'd
Appendix D Electronical Requirements
Appendix D Electronical Requirements - Cont'd
Table D-1 -- Point of Presence (POP)
Table D-1 -- Point of Presence (POP) - Cont'd - ufc_3_580_100060
Table D-1 -- Point of Presence (POP) - Cont'd - ufc_3_580_100061
Table D-1 -- Point of Presence (POP) - Cont'd - ufc_3_580_100062
Table D-1 -- Point of Presence (POP) - Cont'd - ufc_3_580_100063
Table D-1 -- Point of Presence (POP) - Cont'd - ufc_3_580_100064
Table D-1 -- Point of Presence (POP) - Cont'd - ufc_3_580_100065
Table D-1 -- Point of Presence (POP) - Cont'd - ufc_3_580_100066
Table D-1 -- Point of Presence (POP) - Cont'd - ufc_3_580_100067
Table D-1 -- Point of Presence (POP) - Cont'd - ufc_3_580_100068
Table D-2 Main Cross Connect
Table D-2 Main Cross Connect - Cont'd
Table D-3 Intermediate Cross-Connect
Table D-3 Intermediate Cross-Connect - Cont'd - ufc_3_580_100072
Table D-3 Intermediate Cross-Connect - Cont'd - ufc_3_580_100073
Table D-3 Intermediate Cross-Connect - Cont'd - ufc_3_580_100074
Table D-3 Intermediate Cross-Connect - Cont'd - ufc_3_580_100075
Figure D-1 Typical One-Line Diagram for Facility POPs
Figure D-2 Typical One-Line Diagram for Facility MC's/IC's
Appendix E Protected Distribution Systems
Walls, Floor and Roof
Secure Room (SR)
Figure E-1 PDS Design/Approval Process
PDS Design/Approval Process "A"
PDS Design/Approval Process "B"