PART 2: COST FACTORS FOR MILITARY CONSTRUCTION
96
PART 2: COST FACTORS FOR MILITARY CONSTRUCTION
General Comments
The following tables for Unit Costs for DoD Facilities, Area Cost Factors (ACFs), Size Adjustment Factors, and Inflation Rates apply
to military construction (MILCON) project estimates. These tables are also maintained and available on the National Institute of
Building Science (NIBS) Construction Criteria Database (CCB) through the Whole Building Design Guide (WBDG). Please address
any questions regarding the following tables or cost engineering procedures to yo ur participating Service member of the Tri-Service
Committee on Cost Engineering.
Air Force: Mr. R. J. Furlong
HQ USAF/ILEC
Washington, DC 20330-1260
(703) 601-0197 or DSN 329-0197
Internet: robert.furlong@pentagon.af.mil
Army:
Mr. M. D. Jumilla
HQ USACE/CECW-EI
441 G Street N.W.
Washington DC. 30314-1000
(202) 761-7687 or DSN 763-7687
Internet: miguel.d.jumilla@usace.army.mil
Navy:
Ms. L. Walters
NAVFACENGCOM-CHENG, Washington Navy Yard
1322 Patterson Ave., SE, Suite 1000
Washington, DC 20374-5065
(202) 685-9189 or DSN 325-9189
Internet: Leticia.walters@navy.mil