UM = LF
Construction Cost Factor (CCF)
.42/LF, based on data provided by Marshall & Swift #62/3 for the average cost of 8" steel
pressure pipe with a factor built in for valves.
Sustainment Cost Factor (SCF)
.11/LF, the sustainment factor was calculated using data from RS Means.