UM = LF
Construction Cost Factor (CCF)
.00/LF, based on data provided by Marshall & Swift #62/3 for the average cost of utility
pressure steel piping.
Sustainment Cost Factor (SCF)
||content||
.90/LF, the sustainment factor was calculated using data from RS Means.