For enlisted dormitory (barracks), use the project size adjustment factors in Table
2C in addition to the size adjustment factors in Table 2B, as applicable. An
example is provided below.
2-3.2
Examples
You propose to build a 144 Person/Room (4,752 m2) Enlisted
Barracks/Dormitory in FY08. The referenced facility size taken from
the unit cost summary is 9,250 m2. The size relationship ratio is 0.51
(4,752 m2 divided by 9,250 m2). Enter the size adjustment table to find
the Size Adjustment Factor of 1.08 and the project size adjustment
factor of 1.03. Multiply the unit cost of
||content||
,841/m2 by 1.08 and 1.03 to
determine the adjusted unit cost of ,048/m2.
You propose to build a 3,500 m2 multi-purpose administrative facility in
FY08. The referenced facility size taken from the unit cost summary is
2,300 m2. The size relationship ratio is 1.52 (3,500 m2 divided by
2,300 m2). Enter the size adjustment table to find the Size Adjustment
Factor of 0.96. Multiply the unit cost of
||content||
,841/m2 by 0.96 to determine
the adjusted unit cost of
||content||
,767/m2.