UFC 3-701-06
30 March 2006
Table 3: FAC Cost Factors
Table 3: FAC Cost Factors for DoD Cost Models (not to be used for Military Construction projects)
All columns represent $FY06 per UM except "Mod" column which is fraction with no units
FAC
FAC Title
UM
Replacement
Sustain-
Mod
Fire/
Energy
Water/
RP Mgmt
RP Lease
Custod
Refuse
Grnds
Pvmt
Pest
Engy
ment
Emer
waste-
Maint
Clrnc
Ctrl
Mgmt
water
1111
Fixed-Wing Runway, Surfaced
SY
117.37
1.29
0.0133
0.00
0.00
0.00
0.22
19.33
0.00
0.00
0.26
0.13
0.06
0.00
1112
Rotary-Wing Landing Area,
SY
117.37
0.93
0.0133
0.00
0.00
0.00
0.22
19.33
0.00
0.00
0.11
0.13
0.02
0.00
Surfaced
1113
Runway Overrun Area, Surfaced
SY
117.37
0.75
0.0133
0.00
0.00
0.00
0.22
19.33
0.00
0.00
0.26
0.13
0.06
0.00
1114
Runway, Unsurfaced
SY
6.73
0.17
0.0133
0.00
0.00
0.00
0.02
1.38
0.00
0.00
0.26
0.00
0.06
0.00
1121
Taxiway, Surfaced
SY
102.21
0.93
0.0099
0.00
0.00
0.00
0.22
19.33
0.00
0.00
0.07
0.13
0.01
0.00
1122
Rotary-Wing Taxiway, Surfaced
SY
102.21
0.93
0.0099
0.00
0.00
0.00
0.22
19.33
0.00
0.00
0.07
0.13
0.01
0.00
1131
Aircraft Apron, Surfaced
SY
119.63
0.93
0.0099
0.00
0.00
0.00
0.22
19.33
0.00
0.00
0.00
0.13
0.00
0.00
1161
SY
109.20
0.93
0.0099
0.00
0.00
0.00
0.22
19.33
0.00
0.00
0.07
0.05
0.01
0.00
Surfaced
1162
Missile Launching Pad, Surfaced
SY
109.20
0.93
0.0099
0.00
0.00
0.00
0.22
19.33
0.00
0.00
0.07
0.05
0.01
0.00
1163
Aircraft Washing Pad, Surfaced
SY
109.20
0.93
0.0099
0.00
0.00
0.00
0.22
19.33
0.00
0.00
0.07
0.05
0.01
0.00
1164
Miscellaneous Airfield Pavement,
SY
109.20
0.93
0.0099
0.00
0.00
0.00
0.22
19.33
0.00
0.00
0.07
0.13
0.01
0.00
Surfaced
1165
Aircraft Pavement Shoulder
SY
109.20
0.75
0.0099
0.00
0.00
0.00
0.22
19.33
0.00
0.00
0.07
0.05
0.01
0.00
1166
Miscellaneous Airfield Pavement,
SY
6.73
0.17
0.0133
0.00
0.00
0.00
0.02
1.38
0.00
0.00
0.07
0.00
0.01
0.00
Unsurfaced
1167
Aircraft Rinse Facility
SY
159.00
0.83
0.0210
0.00
0.00
0.00
0.22
19.33
0.00
0.00
0.07
0.05
0.01
0.00
1211
Aircraft Fueling Facility
GM
298.86
9.86
0.0210
0.00
12.83
0.00
0.67
59.92
0.00
0.00
0.00
0.00
0.00
0.00
1212
GM
298.86
9.86
0.0210
0.00
12.83
0.00
0.67
59.92
0.00
0.00
0.00
0.00
0.00
0.00
1221
Marine Fueling Facility
GM
23.27
0.77
0.0170
0.00
1.00
0.00
0.05
4.66
0.00
0.00
0.00
0.00
0.00
0.00
1231
Vehicle Fueling Facility
OL
12,173.98
444.41
0.0252
0.00
0.00
0.00
27.15
2,438.27
0.00
0.00
0.00
0.00
0.00
0.00
1241
Operating Fuel Storage
GA
4.12
0.09
0.0199
0.00
0.00
0.00
0.01
0.82
0.00
0.00
0.00
0.00
0.00
0.00
1251
POL Pipeline
MI
559,579.65
18,466.13
0.0199
0.00
0.00
0.00
1,247.86
112,075.47
0.00
0.00
0.00
0.00
0.00
0.00
1261
Liquid Fuel Loading/Unloading
OL
12,173.98
401.74
0.0252
0.00
0.00
0.00
10.06
903.68
0.00
0.00
0.00
0.00
0.00
0.00
Facility
1262
POL Pump Station
SF
614.46
20.28
0.0119
0.03
0.00
0.00
1.27
114.47
0.00
0.00
0.01
0.00
0.00
0.04
1311
Communications Bldg
SF
198.94
3.37
0.0120
0.03
12.81
0.18
0.44
39.96
1.15
0.08
0.01
0.00
0.03
0.04
1312
SF
538.02
9.09
0.0123
0.03
1.47
0.09
1.10
99.20
1.15
0.08
0.01
0.00
0.03
0.04
1321
EA
42,185.53
712.94
0.0123
0.00
0.00
0.00
94.07
8,449.13
0.00
0.00
0.00
0.00
0.00
0.00
1331
Aircraft Navigation Bldg
SF
286.71
7.09
0.0120
0.03
70.93
0.00
0.64
57.42
1.15
0.08
0.01
0.00
0.01
0.04
1341
Aircraft Navigation Facility
EA
8,699.53
147.02
0.0123
0.00
0.00
0.00
19.40
1,742.39
0.00
0.00
0.00
0.00
0.00
0.00
1351
Communications Lines
MI
78,242.80
140.03
0.0221
0.00
0.00
0.00
174.48
15,670.87
0.00
0.00
20.40
0.00
0.00
0.00
1361
Airfield Pavement Lighting
LF
63.00
3.37
0.0301
0.00
0.49
0.00
0.97
87.13
0.00
0.00
0.00
0.00
0.00
0.00
1362
Airfield Lighting
EA
2,524.50
45.05
0.0301
0.00
688.09
0.00
5.49
493.28
0.00
0.00
0.00
0.00
0.00
0.00
1371
Ship Navigation Bldg
SF
198.94
3.91
0.0120
0.03
11.97
0.23
0.45
40.20
1.16
0.08
0.01
0.00
0.03
0.04
1381
Ship Navigation Facility
EA
12,747.71
22.95
0.0123
0.00
0.00
0.00
28.59
2,568.19
0.00
0.00
0.00
0.00
0.00
0.00
1402
Air Defense Operations Bldg
SF
200.13
3.26
0.0120
0.03
1.96
0.10
0.45
40.32
1.16
0.08
0.01
0.00
0.03
0.04
1403
Missile Operations Bldg
SF
407.85
5.16
0.0120
0.03
1.96
0.10
0.91
82.17
1.16
0.08
0.01
0.00
0.03
0.04
17