Home
Download PDF
Order CD-ROM
Order in Print
Home
>
United Facilities Criteria CD 2
>
> Navy Air Traffic Control Facilities - index
Navy Air Traffic Control Facilities - index
Navy Air Traffic Control Facilities - ufc_4_133_01n0001
Unified Facilities Criteria (UFC) - ufc_4_133_01n0002
Foreword - ufc_4_133_01n0003
Contents - ufc_4_133_01n0004
Contents - Cont'd - ufc_4_133_01n0005
Figures - ufc_4_133_01n0006
Chapter 1 Introduction - ufc_4_133_01n0007
Purpose of Criteria
Naval Air Systems Command (NAVAIR).
Policy Statement
Chapter 2 Air Traffic Control Facilities
Function
Windows - ufc_4_133_01n0013
Additional Design Criteria - ufc_4_133_01n0014
Mechanical Requirements - ufc_4_133_01n0015
Heating - ufc_4_133_01n0016
Security - ufc_4_133_01n0017
Architectural and Structural Requirements - ufc_4_133_01n0018
Air Conditioning.
Uninterrupted Power Supply (UPS) - ufc_4_133_01n0020
Air Traffic Control Tower (ATCT)
Architectural and Structural Requirements - ufc_4_133_01n0022
Outside Access
Windows - ufc_4_133_01n0024
Mechanical Requirements - ufc_4_133_01n0025
Plumbing - ufc_4_133_01n0026
Design Dead Loads
Table 1 Floor Loads
Seismic Design.
Antiterrorism Requirements.
Additional Design Criteria.
Chapter 3 General Design Criteria - ufc_4_133_01n0032
Table 2 Room Noise Levels
Structural Design.
Mechanical Engineering
Electrical Engineering - ufc_4_133_01n0036
Emergency Generator Fuel Storage - ufc_4_133_01n0037
Physical Security - ufc_4_133_01n0038
Intrusion Detective Systems (IDS)
Roof and Floor Construction
Safety and Health
Design Standards - ufc_4_133_01n0042
Table 3 Air Traffic Control Activity Gross Area Allowances
Figure 1 ATCT, Typical Building Section
Figure 2 ATCT, Typical Floor Layout
Figure 3 ATCT, Ground Floor Layout
Figure 4 ATCT, Cab Layout
Figure 5 ATCT, Roof Plan
Figure 6 RATCF Facility Site Plan
Figure 7 RATCFBuilding Layout
Figure 8 RATCF Facility Design Notes
Figure 9 FACSFAC Facility Site Plan
Figure 10 FACSFAC Building Layout
Figure 11 FACSFAC Facility Design Notes
Figure 12 Joint Control Facility (Medium Density) Site Plan
Figure 13 Joint Control Facility (High Density) Site Plan
Figure 14 Joint Control Facility (Medium Density) Building Layout
Figure 15 Joint Control Facility (High Density) Building Layout
Figure 16 Joint Control Facility (High Density) Building Layout Part 1
Figure 17 Joint Control Facility (High Density) Building Layout Part 2
Figure 18 Joint Control Facility Design Notes
Figure 19 Radio Antenna Tower
Figure 20 ASR Antenna Tower
Figure 21 Indoor Emergency Generator Room
Appendix A Glossary of Acronyms
Appendix A Glossary of Acronyms - Cont'd
Appendix A Glossary of Acronyms - Cont'd
Appendix B references - ufc_4_133_01n0068
Government Publications - ufc_4_133_01n0069
Government Publications - Cont'd - ufc_4_133_01n0070
Non-Government Publications - ufc_4_133_01n0071
Non-Government Publications - Cont'd - ufc_4_133_01n0072