UFC 4-133-01N
24 February 2005
Including changes 1 and 2, 7 March 2007
MIL-HDBK-1190, Facility Planning and
Design Guide
Shielded Enclosures
P-80, Facility Planning Criteria for
Navy and Marine Corps Shore
Installations
P-80.3, Facility Planning Factor
Criteria for Navy and Marine Corps
Shore Installations
3. Space and Naval Warfare Systems
SPAWARINST 2804.1, Policy and
Command
Procedures Concerning Base
SPAWAR
Electronic Systems Engineering Plan
4301 Pacific Highway
San Diego, CA 92110-3127
http://enterprise.spawar.navy.mil
4. U.S. Army corps of Engineers
TI 809-04, Seismic Design for
USACE Headquarters
Buildings
441 G. Street, NW
Washington, DC 20314
202-761-0011
http://www.hnd.usace.army.mil/techinfo/
5. Federal Aviation Administration
FAA Order 6480.4, ATCT Siting
Criteria
FAA
800 Independence Ave, SW
FAA Order 6480.7, Airport Traffic
Washington, DC 20591
www.faa.gov
Control Tower and Terminal Radar
Approach Control Facility Design
FAA Specification FAA-E-2470,
Transparent Plastic Window Shades
FAA-ER-530-81-04,
Structural/Mechanical Design
Requirements for Low Impact
System Structures (MLS/LIRS)
FAA Advisory Circular AC 70/7460,
63