MIL-HDBK-1024/1
+)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))),
*
*
*
*
TACAN
*
*
*
*
Plumbing Requirements (G.P.M.):
*
*
Water;
*
*
Cold
8
*
*
Hot
None
*
*
*
*
Fire Protection Requirements
*
*
Not Included
*
*
*
*
*
*
Heating Requirements (BTU/HRx1000):
*
*
(Inside Design Temperature = 70 Degs. F)
*
*
Outside Design Temperature
-5 Degs. F
30
*
*
+5 Degs. F
26
*
*
+15 Degs. F
22
*
*
+25 Degs. F
18
*
*
*
*
*
*
*
*
Based on 91 Degs. D.B.
76 Degs. W.B. Outside Design
*
*
Conditions; Cooling Load
31
*
*
*
*
Heat rejected to conditioned spaces by energized test.
*
*
Equipment & parts under repair not included.
*
*
*
*
*
*
Electrical Requirements (KVA):
*
*
Lights;
*
*
Connected Load
0.5
*
*
Estimated Demand
0.5
*
*
*
*
Power;
*
*
Connected Load
20.5
*
*
Estimated Demand
14.4
*
*
*
*
*
*
Connected Load
9.0
*
*
Estimated Demand
9.0
*
*
*
*
Total;
*
*
Connected Load
30.0
*
*
Estimated Demand
23.9
*
*
20.0
*
*
*
*
Areas (SF):
*
*
Gross area including mechanical
*
*
equipment room
300
*
*
*
*
General Notes:
*
*
*
*
Plumbing cold water requirements are for restrooms,
*
*
when required.
*
*
/))))))))))))))))))))))))))))))))))0)))))))))0))))))))))))))))))))))0))))))))1
* TITLE
* DATE
*
* SHEET *
FACILITY PLATE
*
TACAN Facility Design Notes * 11/92 *
* 4 OF 4 *
133-25
.))))))))))))))))))))))))))))))))))2)))))))))2))))))))))))))))))))))2))))))))-
38