MIL-HDBK-1024/1
+)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))),
*
*
*
*
ASR
*
*
*
*
Plumbing Requirements (G.P.M.):
*
*
Water;
*
*
Cold
8
*
*
Hot
None
*
*
*
*
Fire Protection Requirements
*
*
Not Included
*
*
*
*
Heating Requirements (BTU/HR x 1000):
*
*
(Inside Design Temperature = 70 Degs. F)
*
*
Outside Design Temperature
-5 Degs. F
99
*
*
+5 Degs. F
86
*
*
+15 Degs. F
73
*
*
+25 Degs. F
35
*
*
*
*
*
*
Based on 91 Degs. D.B.
76 Degs. W.B. Outside Design Conditions;
*
*
100% Outside Air
*
*
Cooling Load
240
*
*
*
*
Heat rejected to conditioned spaces by energized test.
*
*
*
*
Equipment & parts under repair not included.
*
*
*
*
Electrical Requirements (KVA):
*
*
Lights;
*
*
Connected Load
5.0
*
*
Estimated Demand
3.5
*
*
*
*
Power;
*
*
Connected Load
88.0
*
*
Estimated Demand
61.6
*
*
*
*
*
*
Connected Load
26.0
*
*
Estimated Demand
18.2
*
*
*
*
Total;
*
*
Connected Load
119.0
*
*
Estimated Demand
83.3
*
*
*
*
*
*
75.0
*
*
*
*
Areas (SF):
*
*
Gross area including mechanical
*
*
equipment room
1,400
*
*
*
*
General Notes:
*
Plumbing cold water requirements are for the restroom, when required. *
*
*
*
/)))))))))))))))))))))))))))))))))))))0)))))))0)))))))))))))))))))))0))))))))1
* TITLE
* DATE *
* SHEET *
FACILITY PLATE
*
ASR Facility Design Notes * 11/92 *
* 3 OF 3 *
133-75
.)))))))))))))))))))))))))))))))))))))2)))))))2)))))))))))))))))))))2))))))))-
72