UFC 4-150-02
12 May 2003
Including change 1, 19 January 2007
Table C-5 Shore Services - Oily Waste/Waste Oil (OWWO) Discharge
Discharge
Discharge
Pump
Pump
Rating,
QPEAK,
QAVE,
Connection
Connection
Location
Size
Ship
Station
Pump
GPM
GPD
GPD
(1)
(7)
Symbol
(2)
(3)
(4)
(5)
(6)
AIRCRAFT
CARRIERS
CVN-65
1
1A
200
35,000
35,000
2 Connections @ Main Deck:
2.5"
1B
200
Frame 146 Starboard; Frame 149 Port
CVN-68 to
1
1A
90
80,000
35,000
2 Connections @ Main Deck:
71
2.5"
Frame 128 (512' aft of FP) Port,
Frame 170 (680' aft of FP) Starboard
CVN-72 to
1
1A
90
80,000
35,000
3 Connections @ Main Deck:
77
2.5"
1B
90
Frame 128 (512' aft of FP) Port,
2 each @ Frame 170 (680' aft of FP) Starboard
SURFACE
COMBATA
NT
CG-47
1
1A
50
12,000
3000
Oily Waste Transfer Pump (50gpm) 2 Connections @
01 Lvl:
2.5"
1B
15
Frame 366 Port; Frame 364 Starboard
2
2A
50
Gas Turbine Drain Pumps (15gpm) 2 Connections @ 01
Lvl
2B
15
Frame 360 Port; Frame 366 Starboard
DDG-51
1
1A
50
12,000
3000
2 Connections @ 01 Level:
2.5"
2
2A
50
Frame 219 Port, Frame 219 Starboard
FFG-7
1
1A
50
6750
1500
2 Connections @ Main Deck:
2"
Frame 212 Port, Frame 212 Starboard
SUBMARI
NE
C-11