UFC 4-150-07
19 June 2001
FIGURES
Title
Figure
2-1
Single-Deck, open Pier.............................................................................. 2-6
2-2
Double-Deck, Open Pier............................................................................ 2-6
2-3
Solid-Fill Pier ............................................................................................. 2-8
2-4
Floating Pier Design Concept.................................................................... 2-8
2-5
Drydocking Facilities.................................................................................. 2-9
2-6
Seawall Configurations.............................................................................. 2-11
2-7
Groin.......................................................................................................... 2-12
2-8
Typical Location of Jetties ......................................................................... 2-13
2-9
Breakwater ................................................................................................ 2-14
3-1
Three Groups of Marine Borers................................................................. 3-5
3-2
Fumigant Vials for Timber Piles................................................................. 3-10
3-3
Pile Top Bonnet for Timber Piles............................................................... 3-10
3-4
Timber Pile Jacket for Ice Protection ......................................................... 3-12
4-1
Safety Plan Format.................................................................................... 4-3
4-2
Environmental Documentation Process..................................................... 4-6
5-1
Exposure Zones on Piling.......................................................................... 5-7
5-2
Tools and Equipment Used for Waterfront Inspection ............................... 5-11
5-3
Standard Pile Inspection Report Form....................................................... 5-12
5-4
Pile condition Ratings for Concrete Piles................................................... 5-13
5-5
Pile Condition Ratings for Timber Piles ..................................................... 5-14
5-6
Damage Areas Involving Timber Members ............................................... 5-16
5-7
Damage to Timber Piles from Biological Sources ..................................... 5-17
5-8
Damage to Timber Piles from Non-Biological Sources.............................. 5-18
5-9
Damage to Timber Sheet Piling................................................................. 5-19
5-10
Timber Structures and Attachments (Above Water) Checklist................... 5-21
5-11
Timber Structures and Attachments (Below Water) Checklist ................... 5-22
5-12
Concrete Structures and Attachments (Above Water) Checklist ............... 5-25
5-13
Inspection Areas for Visual Indications of Concrete and Reinforcement
Deterioration.............................................................................................. 5-26
5-14
Typical Damage to Concrete Piles form Non-Biological Sources .............. 5-27
5-15
Concrete Structures and Attachments (Below Water) Checklist................ 5-29
5-16
Inspection of Steel Structures (Above Water) Checklist ............................ 5-32
5-17
Corrosion Damage to Steel Bearing and Sheet Piling ............................... 5-34
5-18
Damage to Steel Bearing and Sheet Piles from Overloading, Wall Movement
or Scour..................................................................................................... 5-35
5-19
Underwater Steel Structures Checklist ...................................................... 5-35
5-20
Quaywall Surface and Underwater Inspection Checklist ........................... 5-38
6-1
Repairs to Timber Pier Structure ............................................................... 6-8
6-2
Repair by Replacing Timber Fender Pile and Damaged Chocks and Wales
.................................................................................................................. 6-10
6-3
Wrapping Timber Piles with Polyvinyl Chloride ......................................... 6-12
6-4
Posting Timber Pile with Pile Butt and Fish Plates .................................... 6-14
6-5
Concrete Encasement Repairs to Timber Pile........................................... 6-16