UFC 4-150-07
19 June 2001
3.1.2
Observed Inspected Condition
3.1.3
Structural Condition Assessment
3.1.4
Mooring Hardware Assessment (Note 1)
3.1.5
Recommendations
Repeat the above as necessary for each facility
Appendices
A - Key Personnel
B - Inspection Procedure/Level
C - Structural Data
D - Pertinent Background Information
E - Calculations for Structural Assessment
F - Backup Data for Cost Estimates
G - Cost Estimate Summary
H - References
Note 1: With increased emphasis on Heavy Weather Mooring, pay particular
attention to mooring hardware, i.e. type, location, strength, capacity of cleats,
bitts and bollards.
5-40