MIL-HDBK-1191
FIGURE 1-1 (CONTINUED)
INCHES
20. WHAT IS AVERAGE ANNUAL RAINFALL?
INCHES
21. WHAT IS AVERAGE ANNUAL SNOWFALL?
SUM DB
WB
22. WHAT ARE THE CLIMATIC CONDITIONS?
WIN DB
23. DOES WATER SUPPLY NEED TO BE TREATED?
Y
or
N
24. WHAT IS THE AVAILABILITY OF UTILITIES TO THE SITE?
DISTANCE TO
CAPACITY AVAILABLE
SYSTEM
CONNECTION POINT
TO SITE
FEET
GPM
PSI
WATER
FEET
_____GPM
PSI
FIRE WATER
#/HR
PSI
CLEAN STEAM
___________ FEET
FEET
#/HR
PSI
UNTREATED STEAM
FEET
GPM
TEMP
HI-TEMP HOT WATER
FEET
GPM
TEMP
CHILLED WATER
FEET
GPM
SANITARY SEWER
FEET
GPM
STORM SEWER
FEET
GPM
CFM
GAS
FEET
KVA
KILOVOLT
ELECTRICAL-Primary
ELECTRICAL-Alternate
___________ FEET
_____KVA
_____KILOVOLT
FEET
CABLE TV
FIBER OPTIC LINE
___________ FEET
FEET
SWITCH CAPACITY
FEET
#/DAY
PATH. WASTE
25.
26. Is the site coordinated with the installation and tied into the
installation Master Plan?
27. Has the history of the site been researched and investigated at
least fifty years prior?
28.
ADDITIONAL REMARKS: (Add additional pages if necessary):
1-15