of a performance specification. If the design becomes proprietary, this shall
be immediately reported to the Design Agent's Project manager. Also, the
types of tests needed to evaluate the specified performance of these devices
are often specific to the type of device. The A-E shall include in design
documents the requirements for performance tests that are appropriate for the
actual device(s) provided for by the design.
5.8.2.2
Certain nonstructural systems, services, and will be required for
the post-earthquake life-safety or operational performance levels of the
health care facility, as addressed at Section 6 of this Military Handbook.
The structural design of the restraints and anchorages of these important
nonstructural elements is an integral part of the structural design of the
facility.