LARGE OFFICERS CLUB
7-5.13 STEP M - UTILITY & THERMAL LOADS
7-5.13.1
Building
data
A.
Gross
floor
area
B.
Max. population at one time
C.
Max. meals served/day
7-5.13.2
Utility
loads
A.
Electrical:
Light and power
B.
Water:
Max.
flow
rate,
cold
water
Max.
flow
rate,
hot
water
T o t a l flow per day
C.
Total
gallons
per
day
Sewage:
7 - 5 . 1 3 . 3 Heating and cooling loads
A.
Load
B.
Air
conditioning:
Tons
of
refrigeration
7 - 5 . 1 3 . 4 Design assumptions
A l l policy and design criteria per DOD 4270.1-M.
A.
E s t i m a t e s are for plans shown.
B.
D.
Heat
load
in
kitchen
not
included
in
heat
gain
calculations.
E.
Single glazing, standard glass.
F.
20% outside air assumed f o r
ventilation.
G.
Assumed
perimeter
heat
loss :
40 BTU/hr./ft.
H.
Sewage demand based on
10
gpd
per
person,
max.
occupancy.
I.
L i g h t i n g load assumed 2 5
watts/s.f.
7-44