UFC 4-740-18AN
1 MARCH 2005
Foreword - Continued
1
GENERAL BUILDING REQUIREMENTS. Design all DoD facilities to
comply with UFC 1-200-01, Design: General Building Requirements. If any conflict
occurs between this UFC and UFC 1-200-01, the requirements of UFC 1-200-01 take
precedence.
2
SAFETY. Design all DoD facilities to comply with DODINST 6055.1 and
applicable Occupational Safety and Health Administration (OSHA) safety and health
standards.
NOTE: All NAVY projects, must comply with OPNAVINST 5100.23 (series), Navy
Occupational Safety and Health Program Manual. The most recent publication in this
series can be accessed at the NAVFAC Safety web site:
OPNAVINST 5100.23, the requirements of OPNAVINST 5100.23 take precedence.
3
FIRE PROTECTION. Design all DoD facilities to comply with UFC 3-600-
01, Design: Fire Protection Engineering for Facilities. If any conflict occurs between this
UFC and UFC 3-600-01, the requirements of UFC 3-600-01 take precedence.
4
ANTITERRORISM/FORCE PROTECTION. Design all DoD facilities to comply
with UFC 4-010-01, Design: DoD Minimum Antiterrorism Standards for Buildings. If any
conflict occurs between this UFC and UFC 4-010-01, the requirements of UFC 4-010-01
take precedence. Remember, project drawings provide the construction information
necessary for the installation of all elements required for force protection, but must not
contain information on force protection methods, philosophy or information on design
threats. For further guidance, contact the appropriate service criteria development
office.