SAMPLE TRACK REHABILITATION REPORT
This sample report illustrates the type of information and level of detail suggested for an analysis of a
military railroad network in preparation for rehabilitation work. The material that explains how the work is
normally conducted is included for the benefit of the reader and would not be necessary in an actual
rehabilitation plan.
Included in this example report are:
1) A description of track and roadway condition.
2) A problem/defect analysis.
3) A sequential work plan to correct the defects.
4) Cost estimates for each item of the work plan.
The material in appendix C covers the structural evaluation that is normally required in a rehabilitation
plan. The operational evaluation (not detailed here) should follow the guidance in chapter 5, paragraph 5.
C-1