CEMP-E
TI 850-02
AFMAN 32-1125(I)
1 MARCH 2000
Table D-4 provides a detailed listing of turnouts included in Phases 1 and 2, along with a rough
approximation of switch tie requirements and switch point replacements. (Exact requirements should be
determined for inclusion in contract work statement).
Phase
Number of Turnouts
$ Estimate
1
10
19,8
2
12
12,150
Total
12
$ 31,950
Note:
1)
Unit Cost varies with work required.
Estimates based on:
a) 50/turnout for surfacing,
miscellaneous parts, and cleaning and
adjustment.
b) /switch tie, installed.
2)
Estimate allows for 74 switch ties in Phase
1 and 126 in Phase 2. (See table 4).
3)
Estimate allows for seven switch points to
be replaced in Phase 1 and 6 in Phase 2.
Cost per point (installed) is estimated to be
about 0 for a 16 ft, 6-in. point.
Table C-4. Turnout Rehabilitation
Switch Tie
Requirement
Phase
Line
I.D. Number
Location
Direction
(1) Point Replacement
1
MAIN
M03
24+67
RIGHT
8
LR
M04
39+88
LEFT
R
M05
40+21
LEFT
LR
M07
44+84
LEFT
12
EAST
E03
3+64
LEFT
10
E04
14+49
LEFT
8
E08
36+15
RIGHT
20
E10
42+77
LEFT
8
E12
49+60
RIGHT
8
E17
117+95
LEFT
LR
74
7
2
MAIN
M13
134+51
RIGHT
15
M15
155+02
LEFT
5
M16
162+11
LEFT
5
M17
170+55
RIGHT
9
LR
WEST
W09
69+23
RIGHT
8
L
W11
70+89
LEFT
8
W12
71+54
RIGHT
8
R
C-31