Productivity example
Figure 6-1. Productivity versus overtime

Construction Cost Estimates - index
Page Navigation
  26    27    28    29    30  31  32    33    34    35    36  
CEMP-E/CECW-E
EI 01D010
1 September 1997
factor of temperature and protection level. Figure 6-
protection level and productivity for heavy and light
3 graphically illustrates the correlation between the
work.
Example 6-1.
Production Example
This example is for light work with average temperature > 85 degrees
PROTECTION LEVEL
A
B
C
D+
Normal
Paid Time (minutes)
480
480
480
480
480
(per person or crew)
Nonproductive Time(minutes):
Standard Losses
160
140
128
76
20
Scheduled Heat Stress
Breaks
120
86
101
63
30
Dexterity Losses
60
64
44
3
0
____
____
____
____
____
Nonproductive Time (min.)
340
290
273
142
50
Productive Time (minutes)
140
190
207
338
430
Productivity
140/430 190/430 207/430 338/430 430/430
x
100%
100%
100%
100%
100%
=
33%
44%
48%
79%
100%
Example: Normal production
3
Rate (M /HR)
190
190
190
190
190
X Productivity
x .33
x .44
x .48
x .79
x 1.00
= Reduced Production
Rate (M3/HR)
63
84
91
150
190
6-4






Western Governors University
< Previous Page
Index ^
Next Page >

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.