> Construction Cost Estimates - index
Construction Cost Estimates - index
Construction Cost Estimates - ufc_3_700_02a0001
Unified Facilities Criteria (UFC) - ufc_3_700_02a0002
Foreword - ufc_3_700_02a0003
Engineering Instructions
Foreword - ufc_3_700_02a0006
Chapter 1 Introduction - ufc_3_700_02a0011
Chapter 2 Background and Objectives
Degree of Detail
Price Level/Escalation Adjustment
Release of Government Estimates under the Freedom of Information Act (FOIA)
Table 2-1 Feature Codes and Descriptions
Civil Works Program Specific Requirements - ufc_3_700_02a0017
Military Program Specific Requirements
HTRW Program Specific Requirements - ufc_3_700_02a0019
Chapter 2 Basics for Preparation of Estimates
Price Sources
Costs and Pricing
HTRW Program Specific Requirements - ufc_3_700_02a0023
Chapter 4 Composition of Government Estimates
Government Estimate Backup Data
Miscellaneous Support Data
Figure 4-1. Composition of an estimate
Chapter 5 Labor
Taxes and Insurance
HTRW Program Specific Requirements - ufc_3_700_02a0030
Table 5-1. Overtime and shift differential
Chapter 6 Labor Productivity
Levels of personal protection
Productivity example
Example 6-1. Production Example
Figure 6-1. Productivity versus overtime
Figure 6-2. Levels of protection
Figure 6-3. HTRW productivity factors
Table 6-1. HTRW Light Work
Table 6-2. HTRW Heavy Work
Chapter 7 Construction Equipment and Plant
Equipment Ownership and Operating Expense Cost Rates
HTRW Program Specific Requirements
Chapter 8 Materials and Supplies
Handling and Storage
Chapter 9 Subcontracted Work
Chapter 10 Overhead Costs
General Home Office Overhead (G&A)
Table 10-1. Pollution liability insurance cost
HTRW health and safety
Table 10-2. Level of effort per discipline
Chapter 11 Profit
Civil Works Program Specific Requirements - ufc_3_700_02a0053
Figure 11-1. Weighted guidelines profit sheet
Table 11-1. Guidelines for weighted factors profit determination
Table 11-1. Guidelines for weighted factors profit determination - Cont'd - ufc_3_700_02a0056
Table 11-1. Guidelines for weighted factors profit determination - Cont'd - ufc_3_700_02a0057
Chapter 12 Surety Bonds
Cost of Performance and Payment Bonds
Table 12-1 Bond Rates
Table 12-2 Contract bonds rate classifications
Table 12-2 Contract bonds rate classifications - Cont'd
Chapter 13 Other Costs
HTRW
Cost Escalation
Application of Contingencies
Table 13-1. Contingency factors for construction features
Table 13-2. Technical complexity levels and design contingency factors
Table 13-2. Technical complexity levels and design contingency factors - Cont'd
Chapter 14 Contract Modification and Other Negotiated Procurement
Preparation of Cost Estimates and Negotiation
Impact Costs
Support for the Negotiations
Immediate response contracts
Chapter 15 Preparation of Dredge Cost Estimates
Development of Dredging Estimate
Selection of Equipment
Monthly Costs
Dredging
Figure 15-1. Dredging pay prism
Chapter 16 Protests Orlitigation Concerning the Government Estimate
Security and Disclosure of Government Estimates
Mistake in Bids
Special problems
Chapter 17 Standard Estimating Forms
Military Program
Figure 17-1. Example reasonable contract estimate
Figure 17-2. Example reasonable contract estimate detail summary sheet
Figure 17-3. Example reasonable contract estimate worksheet summary
Figure 17-4. Example reasonable contract estimate worksheet - ufc_3_700_02a0090
Figure 17-4. Example reasonable contract estimate worksheet - ufc_3_700_02a0091
Figure 17-5. Example reasonable contract estimate worksheet
Figure 17-6. Example reasonable contract estimate worksheet
Figure 17-7. Example reasonable contract estimate worksheet
Figure 17-8. Example telephone quotation sheet
Figure 17-9. Example wage rate calculations
Figure 17-10. Example estimate detail summary sheet
Figure 17-11. Example cost estimate analysis
Figure 17-12. Example construction cost estimate worksheet
Figure 17-13. Example crew and productivity worksheet
Appendix A References - ufc_3_700_02a0101
Appendix A References - Cont'd - ufc_3_700_02a0102
Appendix B Sample Estimate Pages
Figure B-2. Sample signature page for Government estimates
Figure B-3. Sample price schedule
Figure B-4. Sample construction schedule
Figure B-5. Sample telephone quotation sheet
Appendix C Work Breakdown Structure
Table C-1. Military Programs Work Breakdown Structure
Table C-2. HTRW WORK BREAKDOWN STRUCTURE (Levels 1 and 2)
Appendix D Sample Checklist for Cost Estimate Preparation
Appendix D Sample Checklist for Cost Estimate Preparation - Cont'd
Appendix E Authomation
Overview of Tri-Service Automated Cost Engineering System (TRACES)
Overview of TRACES Data bases and Files
Assigned Agency
Figure E-1. TRACES system
Glossary Abbreviations and Acronyms
Glossary Abbreviations and Acronyms - Cont'd - ufc_3_700_02a0119
Glossary Abbreviations and Acronyms - Cont'd - ufc_3_700_02a0120
Estimate Detail Summary Sheet
Cost Estimate Analysis
Crew and Productivity Worksheet
Constructing Cost Estimate Worksheet