• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print

Home > United Facilities Criteria CD 2 > > Government Publications - ufc_4_152_010163
Appendix A References - ufc_4_152_010162
Government Publications - Cont'd - ufc_4_152_010164

Design: Piers and Wharves - index
Page Navigation
  159    160    161    162    163  164  165    166    167    168  
UFC 4-152-01
28 July 2005
Physical Security of Facilities
Engineering Innovation and Criteria Office,
6506 Hampton Blvd, Norfolk, VA 23508-
MIL-HDBK-1025/5, Ferry Terminals and
1278
Small Craft Berthing Facilities
P-80, Facility Planning Criteria for
Navy/Marine Corps Shore Installations
P-307, Management of Weight Handling
Equipment
5. Naval Facilities Engineering Command,
Amphibious Warfare Ship to Pier Interface
Atlantic
Study, 10 Feb 2004
Lower Deck Safety Study, Pier 11, Naval
Operations Station Norfolk, 16 April 2004
6. Naval Facilities Engineering Service
NCEL CR 89.005, Prestressed Concrete
Center, 1100 23rd Avenue, Port Hueneme, Fender Piles: Fender System Designs
CA 93043
NCEL R-927, Laterally Loaded Partially
http://www.nfesc.navy.mil/
Prestressed Concrete Piles
NCEL R-935, Lateral Load Distribution on
One-Way Flat Slab
NCAL TM-5, Advanced Pier Concepts,
Users Data Package
NCEL TM 53-89-03, Prestressed Concrete
Fender Piling User Data Package
NCEL, UG-0007, Advance Pier Concepts,
Users Guide
SP-2005-SHR, Limited Flexural Tests of
Plastic Composite Pile Configurations
SP-2045-SHR, Proposed Design Criteria
for Chocks and Wales
TM-2158-SHR, Study on Recycled Plastic
Fender Piles
TR-R6054, Reinforces Landing Float and
Brow
TR-2069-SHe, Design Criteria for
153






Western Governors University
< Previous Page
Index ^
Next Page >

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.