Project Name
Project No. ___________
UFC 4-721-11.1, UEPH Complexes, 26 Nov 01
Number and Type of Lamp(s).
Type of Mounting.
Special Features.
11.3.9.1.5. Details: Construction details, sections, elevations, etc., shall be provided where required
for clarification of methods and materials of design.
11.3.9.2. Required Electrical Design Analysis: Design analysis and calculations for the electrical
systems shall be prepared by a licensed professional engineer with experience in family housing, and
shall be stamped as such. The design analysis shall be separately bound, in one or more volumes.
Show functional and engineering criteria, design information, and calculations applicable to the
project. The analysis shall be organized in a format appropriate for review, approval, and record
purposes. The design calculations shall indicate methods and references identified, and shall explain
assumptions and conclusions.
11.3.9.2.1. Voltage Drop (VD) Calculations: Select conductor sizes of primary feeders, site lighting
circuits, service laterals, and unit feeder conductors. Calculate maximum length for each phase of
each primary circuit, using a maximum allowable VD for each circuit. Calculate voltage drops for each
conductor. Maximum allowable voltage drop for site lighting and service laterals is 3%. The combined
voltage drop for the service laterals, unit feeders, and branch circuit cannot exceed 5%. Calculate the
available fault current at the main breaker for the living unit panel. Provide a coordination study to
support breaker selection.
11.3.10 Specifications: Provide final specifications. The Contractor shall make final identification of
all materials and finishes at this stage.
11.4
Design complete submittal:
11.4.1 Design Drawings: Drawings shall be 100% complete, signed and sealed by the designer of
record. All previous review comments shall be incorporated.
11.4.2 Design Analysis: Complete design analysis for all design disciplines. The final Fire
Protection and Life Safety Analysis shall be included in the Design Analysis.
11.4.3 Comment Response Package: Complete package showing all comments from all previous
reviews and the respective response and disposition.
11.4.4 This submittal shall include all drawings and design information from the 100% site/utility and
100% building design submittal to form a complete design package.
12.0 DESIGN RELATED PRODUCTS
12.1 Architectural Renderings: Contractor shall provide the original and three copies of each ground
level perspective artist's renderings of completed typical facilities with walks, parking, and landscaping.
Renderings shall be no smaller than 14" x 18" or larger than 28" x 36", multi-colored, and shall be
suitably titled, matted, and framed.
12.2 DD Form 1354: Three (3) sets of DD Form 1354, Transfer and Acceptance of Military Real
Property shall be prepared in accordance with ER 415-345-38 and submitted to the Contracting
Officer. Copies of Form 1354 and ER 415-345-38 will be furnished to the successful contractor
following award of the project.
12.3 Submittal Register, ENG FORM 4288: The Contractor shall complete and submit three (03)
copies of a "preliminary" Eng Form 4288, Submittal Register to Contracting Officer. The "preliminary"
Eng Form 4288, Submittal Register shall have the column "Submittal Identification", "Specification
Paragraph Number", "Description of Submittal" "Type of Submittal", and "Remarks" completed; the
S
ection 01012 - Page 17