Unaccompanied Enlisted Personnel Housing (UEPH) Complexes - indexUnaccompanied Enlisted Personnel Housing (UEPH) Complexes - ufc_4_721_11.10001Unified Facilities Criteria (UFC) - ufc_4_721_11.10002Foreword - ufc_4_721_11.10003Volume 1: Project Management Manual - ufc_4_721_11.10004Chapter 1 Introduction to the Design-Build Process The Design-Build Approach in Facility ConstructionThe UEPH Complex ProgramReferences Chapter 2 Utilizing This Document for UEPH Complex Design Build SolicitationsVolume 2, Statement of Work, Editing Instructions for New, ReplacementUsing the STATEMENT OF WORK for RenovationSite Engineering - ufc_4_721_11.10015Volume 2, Editing the Attchments to the Statement of Work Technical SpecificationsChapter 3 Project Development and Site Selection - ufc_4_721_11.10018Environmental EffectsSite Selection - ufc_4_721_11.10020Site Verification - ufc_4_721_11.10021Chapter 4 Code 1 Activities - ufc_4_721_11.10022Scope Verification - ufc_4_721_11.10023Site Investigation - ufc_4_721_11.10024References - ufc_4_721_11.10025Chapter 5 Developing Are Quest for Proposal (RFP)Draft RFP Review and CoordinationFinal RFP Review and CoordinationAcquisition Regulations and Source SelectionCode 7 Activities Matrix - ufc_4_721_11.10030Chapter 6 Advertisting Phase 1 of the RFPAdvertistingAuthority to Advertise Activities Matrix Chapter 7 Receiving Evaluating and Selecting Phase 1 ProposalsLegal and Contracting Review Proposal Evaluation Process - ufc_4_721_11.10036Proposal Evaluation Standards - ufc_4_721_11.10037Phase 1 Selection MemorandumDraft Phase 2 Issuance - ufc_4_721_11.10039Phase 1 Proposal Receipt and Evaluation ActivitiesChapter 8 Issuing the Phase 2 Amendment - ufc_4_721_11.10041Phase 2 Amendment Ativities Chapter 9 Phase 2 Proposal Preperation PeriodQuestions During Phase Two Proposal PeriodPlanning for the Receipt of Phase Two Proposal and EvaluationActivities Matrix - ufc_4_721_11.10046Chapter 10 Receiving and Evaluating Phase two ProposalsPrice Evaluation - ufc_4_721_11.10048Technical Quality Evaluation ProceduresPhase 2 Capability Information Evaluation ProceduresCost Proposal Evaluation ProceduresPhase two Proposal Receipt and Evaluation Activities - ufc_4_721_11.10052Chapter 11 Discussions and AwardSource Selection - ufc_4_721_11.10054Source Selection - ufc_4_721_11.10055Preparing for AwardAward - ufc_4_721_11.10057References - ufc_4_721_11.10058Chapter 12 Post Award Activities - ufc_4_721_11.10059Complesion of DesignConstruction - ufc_4_721_11.10061Post Award ActivitiesAppendix A Phase 1 Evaluation ManualRating Methodology - ufc_4_721_11.10065Overall Proposal Rating Factor 1-1 Offeror Past Performance - ufc_4_721_11.10067Quality of Products ProducedTimeliness of Products Produced - ufc_4_721_11.10069Offeror Management Processes - ufc_4_721_11.10070Weaknesses - ufc_4_721_11.10071 Offeror Management of Subcontractors Offeror Management of Subcontractors - ContinuedFactor 1-1 Summary and Overall Rating - ufc_4_721_11.10074Proposal Rating Worksheet Factor 1-2 Offeror Project Key PersonnelProposal Rating Worksheet Factor 1-3 Offeror Technical Approach NarrativeProposal Rating Worksheet Factor 1-3 Offeror Technical Approach Narrative - Cont'dFactor 1-3 Summary and Overall Rating - ufc_4_721_11.10078Proposal Rating Worksheet Factor 1-4 Offeror Relative ExperiencePhase 1 Summary and Overall Rating - ufc_4_721_11.10080Appendix B Phase 2 Evaluation Manual - ufc_4_721_11.10082Proposal Requirements - ufc_4_721_11.10083Evaluation Factors - ufc_4_721_11.10084Proposal Rating Worksheet Factor 2-1 Building Funtion and AestheticsFunctional Arrangement UEPH (Barracks Facilities) Functional Arrangement Company Operations Facility Functional Arrangement Battalion Headquarters FacilityFunctional Arrangement Brigade Headquarters FacilityBuilding AestheticsFactor 2-1 Summary Rating - ufc_4_721_11.10091Proposal Rating Worksheet Factor 2-2 Building SystemsProposal Rating Worksheet Factor 2-2 Building Systems - ContinuedBuilding Interior Electrical Systems.Integration of Interior Support SystemsForce Protection Considerations - ufc_4_721_11.10096Building Thermal Performance - ufc_4_721_11.10097Building Construction MaterialsCommunication and Telephone Systems. Security Systems. Fire Protection and Detection Systems.Cable Television Systems. Plumbing Systems - ufc_4_721_11.10103Building Structural Systems - ufc_4_721_11.10104Factor 2-2 Summary Rating Chart Factor 2-3. Site Design Considerations Area Development Plan - ufc_4_721_11.10107Force Protection Considerations - ufc_4_721_11.10108Pedestrian Circulation. Grading. Landscaping. Parking AreasSite Amenities.Factor 2-3 Summary Rating Chart Factor 2-4. Site Engineering - ufc_4_721_11.10115Water System. Fuel Piping and Storage Systems. Electrical Distribution System.Communications Systems Sanitary Sewer System - ufc_4_721_11.10120 Storm Sewer System.Pavement Design.Factor 2-4 Summary Rating Chart Factor 2-5. Sustainble Design ConsiderationsFactor 2-6 Offeror Management Plans and Schedules - ufc_4_721_11.10125Factor 2-6 Offeror Management Plans and Schedules - Cont'd - ufc_4_721_11.10126Factor 2-6 Offeror Management Plans and Schedules - Cont'd - ufc_4_721_11.10127Factor 2-6 Offeror Management Plans and Schedules - Cont'd - ufc_4_721_11.10128Factory 2-6 Summary RatingPhase 2. Summary and Overall Rating Appendix C: Summary Evaluation Matrix Proposal Summary Scoring Matrix Unaccompanied Enlisted Personnel Housing (UEPH) Complexes Notes to Usage Activity Preparing Solicitation Solicitation,Offer and Award ( Standard Form 1442) and Pricing ScheduleSolicitation Contract FormSolicitation Contract Form - Continued - ufc_4_721_11.10138Solicitation Contract Form - Continued - ufc_4_721_11.10139Notes - ufc_4_721_11.10140Instructions,Conditions and Notices to Bidders/Offirors Bidding Schedule/Instructions to Bidders Basis of Award - ufc_4_721_11.10143Proposal Submission Requirements and Instructions General Proposal Information Size of Printed Matter Submissions.Project Key PersonnelTechnical Approach Narrative - ufc_4_721_11.10148Sample Transmittal Letter and Past Performance Evaluation Questionnaire Past Performance Evaluation Questionnaire Past Performance Evaluation Questionnaire - Continued - ufc_4_721_11.10151Past Performance Evaluation Questionnaire - Continued - ufc_4_721_11.10152Past Performance Evaluation Questionnaire - Continued - ufc_4_721_11.10153Past Performance Evaluation Questionnaire - Continued - ufc_4_721_11.10154Phase 2 Proposal Submission Instructions Proposal Requirements and Submission FormatSample Quality Control Plan - ufc_4_721_11.10157Technical Data Requirements for Proposal SubmissionDesign drawings - ufc_4_721_11.10159Specifications.Restrictions Proposal Evalaution and Contract AwardTechnical Evaluation Basis of Award - ufc_4_721_11.10164Offeror Project Key PersonnelPhase 2 Evaluation Procedures and Criteria Narrative Consensus CommentsFactor 2-1. Building Function and Asthetics Building Asthetics Building Heating, Ventilating, and Air Conditioning SystemsFactor 2-3. Site Design Consiferations Factor 2-4. Site Engineering - ufc_4_721_11.10172Factor 2-5. Sustainable Design Considerations Sub-Contracting PlanRepresentations & Certifications - ufc_4_721_11.10175Representations & Certifications - ufc_4_721_11.10176Contract Clauses - ufc_4_721_11.10177Contract Clauses - ufc_4_721_11.10178Contract Clauses - Continued - ufc_4_721_11.10179Contract Clauses - Continued - ufc_4_721_11.10180Contract Clauses for Design - Build Construction ContractsProposal Submission Requirements Self-Performed Work Format for Calculation of Self- Performed Work Design/Build Contracts Limitations on Subcontracting Commencement,Prosecution, and Completion of Work Government Rights Special Contract RequirementsSectio 00800. Special Contract RequirementsDesign-Build Contract - Order of Precedence Design - Build Contract - Order of Precedence Key Personnel, Subcontractors and Outside Associates or Consultants Responsibility of the Contractor for Design Sequence of Design/Build Construction - ufc_4_721_11.10193Sequence of Design - Construction Recommended Insurance Coverage Design Conferences Value Engineering After Award - ufc_4_721_11.10197Unaccompanied Enlisted Personnel Housing ( UEPH ) ComplexStatement of Work Contents Statement of Work Contents - Continued - ufc_4_721_11.10200Statement of Work Contents - Continued - ufc_4_721_11.10201Statement of Work Contents - Continued - ufc_4_721_11.10202Chapter 1. Design ObjectivesInstallation Design Guide Organizational Structure Chapter 2. Functional and Are Requirements Individual Living/Sleeping Room Service Area - ufc_4_721_11.10208Bathroom.Module Mechanical Area.Areas Comprising the One-Person Living Unit (Module).BathroomModule Mechanical AreaUEPH Common AreasCharge of Quarters (CQ) Station.Janitor Closet.Public Telephone Area Mailbox Access AreaInterior Corridor. Exterior Corridor.Interior StairsMechanical Areas - ufc_4_721_11.10222Boot Wash Areas.Company Operations Facilities Functional and Area Requirements COF Administrative Areas.First Sergeant (1 SGT).Admin Office.Administrative Area CorridorEntry VestibuleConference Room Storage.Shower RoomCommunication RoomEquipment Maintenance Area.Unit StorageNuclear, Biological and Chemical Equipment (NBC) Storage.Communications StorageCOF Support AreasInterior Stairs.Common Locker/Shower Areas.Table 2.1 Locker Room Plumbing Fixture and Locker QuantitiesMen's Locker Room.Battalation Headquaters (HO)Functional and Area Requirements Executive Officer (XO)Reception Area.Coffee Area.S-1 Clerical/Central FilesS-2 Clerical/Central FilesS-3 Officer. S-3 Clerical/Central Files - ufc_4_721_11.10249Conference Room.Personnel Administration Center (PAC) SectionPAC Officer.Message Mail Center.Chaplain's AssistantLearning Resource CenterBattalion HQ Common Areas.Entry Vestibules. Women's Toilet Room(s).Shower Room. - ufc_4_721_11.10259Battalion HQ Support AreasElevator Machine Room.Brigade Headquarters Facility Functional and Area Requirements Command Sergeant Major (CSM).Command Section ToiletCoffee AreaS-1/PAC Clerical/Central Files.Message Mail CenterSupply RoomS-2 Clerical/Central Files. Secured Documents Vault.S-3 Clerical/Central Files - ufc_4_721_11.10271S-4 Clerical/Central FilesSoldier ServicesChaplainLobby and Corridors.Men's Toilet Room.Shower Room. - ufc_4_721_11.10277Battalion HQ Support Areas.Communication Room. Chapter 3. Site Planning and Design Site Development Plan Grading and Drainage Definitions - ufc_4_721_11.10283Landscape Planting Plan Coniferous Evergreen. Maintenance During Establishment Period.Sprinkler and/or Irrigation System Chapter 4. Site Engineering Table 4-1 Soil Compaction - ufc_4_721_11.10289Water Distribution System Trenches - ufc_4_721_11.10291Sanitary Sewerage System Storm Management SystemsStorm Drainage Collection Systems and Grading Pavement Design CriteriaHeating Hot Water and Chilled Water Distribution Polyethylene (PE) CasingInsulation.Steam and Condensate Return High Temperature Hot Water Distribution Table 4.2 Minimum Pipe Insulation Thickness (mm) For Steam (100 to 2.800 kPa (gage)Table 4.2 Minimum Pipe Insulation Thickness (mm) For Steam (100 to 2.800 kPa (gage) - ContinuedTable 4.3 - Minimun Pipe Insulation Thickness (Inches) For Steam (16 to 408 psig) Table 4.5. Minimun Pipe Insulation Thickness (inches) For Condensate Return Tank storage.Electrical Distribution - ufc_4_721_11.10305Cathodic Protection Copper water service linesChapter 5. Architectural Design IBC Occupancy and Building Type Classifications Miscellaneous Exterior Elements.Locksets on Living Unit Entry DoorsInterior Design - ufc_4_721_11.10312Interior Door Finish Hardware.Bathroom Vanity in Living Units.Physical Security Requirements Floor Anchors for GFGI Security Safes.Chapter 6. Structural Design Special Requirements Chapter 7. Thermal Performance Chapter 8. Plumbing Fixtures - ufc_4_721_11.10321Piping Systems Miscellaneous Items Pipe Insulation - ufc_4_721_11.10324Chapter 9. Electrical Systems Lighting - ufc_4_721_11.10326Cable Television (CATV) System Chapter 10. Unit Design - Heating, Ventilating, and Air Conditioning Table 10-2. Internal Loads Table 10-4. Internal Loads Humid Area Design Mechanical Systems - ufc_4_721_11.10332Incremental Equipment Air Distribution Terminal Units Variable air volume terminal unit.Unit ventilators - ufc_4_721_11.10336Air Distribution Central Equipment - ufc_4_721_11.10337Gas-fired furnaceCentral Heating Equipment Minimum Efficiencies for Water-Cooled ChillersPackaged air cooled liquid chillers.Evaporative condensersAir Distribution Systems Hydronic Distribution Systems Duct insulationEquipment - ufc_4_721_11.10346Testing, Adjusting and Balancing Training - ufc_4_721_11.10348Chapter 11. Energy Conservation Energy Recovery Equipment Rebates and Incentives Chapter 12 Fire ProtectionPrinkler SystemFire AlarmChapter 13 Sustainable Design - ufc_4_721_11.10355Appemdix A ReferencesGoverment Publications - ufc_4_721_11.10357Goverment Publications - Cont'd - ufc_4_721_11.10358Goverment Publications - Cont'd - ufc_4_721_11.10359Goverment Publications - Cont'd - ufc_4_721_11.10360Goverment Publications - Cont'd - ufc_4_721_11.10361Goverment Publications - Cont'd - ufc_4_721_11.10362Goverment Publications - Cont'd - ufc_4_721_11.10363Goverment Publications - Cont'd - ufc_4_721_11.10364List of Attachments to the Statement of Work - ufc_4_721_11.10365Attachment 1 Technical Specifications - ufc_4_721_11.10367Below is a list of specifications which could typically be included in this attachment - ufc_4_721_11.10368Section 1012 Design After AwardPreliminary Conformance 50% Building SubmittalStructural Interior Design - ufc_4_721_11.10371Sequence of Sid SubmitalQuantity of Design Submittals - ufc_4_721_11.10373Goverment Review - ufc_4_721_11.10374Design Calculations - ufc_4_721_11.10375Specifications - ufc_4_721_11.10376Site Grading and Drainage Plans - ufc_4_721_11.10377Landscape, Planting and TurfingState the live loads to be used for designElevatorsDesign of Cathodic Protection - ufc_4_721_11.10381 ArchitecturalSpecific Mechanical and Plumbing RequirementsSpecific Electrical Requirements:Design complete submittal - ufc_4_721_11.10385ReproductionAttachment 2 Reserved - ufc_4_721_11.10387Attachment 3 Reserved - ufc_4_721_11.10388Attachment 4 Reserved - ufc_4_721_11.10389Attchment 5 Proposal Drawing FormatDrawing Preparation - ufc_4_721_11.10392Attachment 6 Site and Locality Maps - ufc_4_721_11.10393Attachment 7 Project and Safety Signs - ufc_4_721_11.10394Attachment 8 Geotechnical Report - ufc_4_721_11.10395Attachment 9 Excerpts from the Installlation Design GuideAttachment 10 Fire Flow Data - ufc_4_721_11.10397