CEMP-E
TI 810-32
10 January 2002
GROUND SURFACE
2'(MIN)
>
INSULATION (TYPICAL)
CARRIER PIPE NO. 2
CARRIER PIPE NO. 1
CASING
NOTE: A STEAM LINE AND A CONDENSATE LINE ARE NOT
TO BE INSTALLED IN THE SAME CASING.
SINGLE CASING SYSTEM (DDT)
NO SCALE
Figure 5-2. Single Casing System Detail.
5-5