> Figure 5-1. Two Casing System Detail
Project Designer's Responsibility -Cont.
Figure 5-2. Single Casing System Detail
Heating and Cooling Distribution Systems
Page Navigation
104
105
106
107
108
109
110
111
112
113
114
CEMP-E
TI
810-32
10
January
2002
CARRIER PIPE (TYPICAL)
AIR SPACE (TYPICAL)
GROUND SURFACE
2' (MIN.)
2' (MIN.)
CASING (TYPICAL)
INSULATION (TYPICAL)
TWO CASING SYSTEM
NO SCALE
Figure 5-1. Two Casing System
Detail.
5-4