Project Designer's Responsibility
Figure 5-1. Two Casing System Detail

 Heating and Cooling Distribution Systems
Page Navigation
  103    104    105    106    107  108  109    110    111    112    113  
CEMP-E
TI 810-32
10 January 2002
system meets the requirements of the contract. As a minimum, the following items are required in this review
process:
(1) carrier pipe size and thickness.
(2) insulation thickness, type and K-value.
(3) casing material and thickness.
(4) casing coating material and thickness.
(5) verification of constant system slope to all low points (proposed elevations at all casing joints
on submitted shop drawing layouts).
(6) cathodic protection design.
(7) manufacturer's system stress analysis.
5-3






Western Governors University
< Previous Page
Index ^
Next Page >

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.