2-12.10 Panel Schedules. Complete all panel schedules. Provide adequate detail to
allow reviewers to check panel loading.
2-12.11 Lighting and Receptacle Layouts. Show all circuit assignments and ensure
they agree with the associated panel sched ule. Show fixture and emergency lighting
locations.
2-12.12 Motor List . Maintain a motor list for the facility and ensure it agrees with the
MCC layouts.
2-12.13 Conduit or Cable Schedule . Conduits should be labeled. Cable
destinations should be shown.