MIL-HDBK-1003/7
Table 3 (Cont.)
+)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))),
* Principal
*
* Item
*
Subitem
Required Data
Comments
*
*
*
*
pressure in distribution
Distribution of
*
Utility Steam, HTW, *
system and in
*
*
consumer equipment.
CHW, Gas, and
*
*
Maximum pressure drop
*
*
through distribution
*
*
system.
*
*
*
*
Purity for ship
Use demineralized
*
*
usage
water for makeup.
*
*
See MIL-HDBK-1025/2,
*
Dockside Utilities for
*
*
Ship Service, for
*
*
other criteria.
*
*
*
*
Condensate
Condensate flow,
Add simultaneous
*
*
return
pressure, and
pumping rates of
*
*
temperature at
all condensate
*
*
condensate storage/
return pumps.
*
*
return tank
*
*
*
*
Ratio of condensate
*
*
return to steam
*
*
* Fuels
*
Availability
Reserves for life
See Section 2 for
*
*
of plant
policy.
*
*
*
*
Natural gas
Determine who
*
*
ultimate analysis,
supplies meter,
*
*
specific gravity,
meter house,
*
*
moisture content,
valving arrangement
*
*
pressure at meter,
and gas piping
*
*
delivered cost per
on site.
*
*
million Btu
*
*
*
*
Liquid
Determine if gas
*
*
petroleum
ultimate analysis,
supply is firm or
*
*
gas
delivered cost per
interruptible.
*
*
million Btu
*
*
*
*
Fuel oils
Grade, heating
Ascertain supply,
.))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))-
25