MIL-HDBK-1003/7
Table 3 (Cont.)
+)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))),
* Principal
*
* Item
*
Subitem
Required Data
Comments
*
*
*
*
water, makeup water
*
*
*
*
fire protection,
*
*
construction purposes.
*
*
*
*
Determine type
*
*
and Source
of water treatment
*
*
*
*
Discharge
Determine discharge
*
*
temperature and
*
*
*
*
Environmental restraints.
*
*
Inlet temperature.
*
*
*
* Electric
Normal
Substation capacity
* service
*
service
and voltage available.
* (available
*
Energy and demand
*
* and required)
charges.
*
*
*
*
Alternate
Alternate source in
*
*
service
case of normal
*
*
service failure.
*
*
*
*
Emergency
Power required,
Determine if
*
*
service
size of electric
continuous.
*
*
*
*
* Plant
*
See Table 1
* location
*
* factors
*
*
*
* Economic
*
Comparison
Capital costs and
See Section 2 for
* studies
*
of various
operating expense
policy. Use most
*
*
types of
including utility
economical system
*
*
generating
costs
in accord with
*
*
equipment for
National energy
*
*
full and
policy.
*
*
partial load
*
*
generation
*
*
.))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))-