MIL-HDBK-1025/10
5.2.1 Preparation Responsibility. Depending on the size of the naval facility
the items listed in the Table 16 may utilize standard forms or provide a standard operating
procedure indicating data to be provided. An employee in charge will initiate the request
for utility operation as shown on Table 16. The rest of the documents of Table 16 will be
provided by the authorized authority for power dispatching switching order outage
packages.
5.2.2 Safety Basics. The basics of safety for every outage consists of the
lockout/tagout/tryout procedures that can be simplified as providing a recognition of
energy hazards, a sequence of lockout/tagout/tryout steps for every energy hazard and
correctly locking and tagging the necessary devices.
Table 16
Switching Order Outage Package Documents
I.
Request for utility interruption.
II.
PWC/EFD scheduled interruption of utility services notice
III.
Notes concerning the outage
IV.
Switch out switching orders
V.
Switch back switching orders
VI.
Lockout/tagout/tryout fact sheet
VII.
Distribution one-line diagrams
VIII.
Outage safety briefing memo
IX.
Switch operator briefing memo
X.
Clearance notice
5.2.2.1 Hazardous Energy Elimination
WARNING
Eliminate any source of hazardous energy affecting the work by
controlling electrical and nonelectrical energy hazards as shown in
Table 17.
29