CEMP-E/CECW-E
EI 01D010
1 September 1997
ER 1110-3-1301
Cost Engineering Policy and General Requirements for
Hazardous, Toxic, and Radioactive Waste Remedial Action Cost
Estimates
ER 1125-2-304
Plant Inspection, Maintenance, Operation and Repair
ER 1130-2-307
Dredging Policies and Practices
EM 1110-2-1304
Civil Works Construction Cost Index System (CWCCIS)
EP 415-1-2
Modification and Claim Guide
EP 1110-1-8
Construction Equipment Ownership and Operating Expense
Schedule
OTHER:
Architect-Engineer
Instruction (AEI)
Project Engineering with Parametric Estimating
A-2