UM = SF
Construction Cost Factor (CCF)
.52/SF, based on data provided from USACE, deflated to FY04 $ using a deflation factor of
0.985.
Sustainment Cost Factor (SCF)
||content||
.50/SF, the sustainment factor was calculated using a
ratio from FAC 4427 (1.47%) as no
other
auditable data was available.
NO LAYOUT AVAILABLE