UM = KG
Construction Cost Factor (CCF)
2.92/KG, based on data contained in the Grand Forks/Dakota Aquifer study by the Bureau of
Reclamation Water Treatment Engineering Team and inflated to FY04 $ using an inflation factor of 1.066.
Sustainment Cost Factor (SCF)
.43/KG, the sustainment factor was calculated using data contained in the Grand
Forks/Dakota Aquifer study by the Bureau of Reclamation Water Treatment Engineering Team and inflated
to FY04 $ using an inflation factor of 1.066.