Home
Download PDF
Order CD-ROM
Order in Print
Home
>
United Facilities Criteria CD 2
>
> FAC 8422 Water Pump Facility, Potable
FAC 8421 Water Distribution Line, Potable
FAC 8431 Water Source, Fire Protection
DOD Facilities Pricing Guide - index
Page Navigation
496
497
498
499
500
501
502
503
504
505
506
FAC
8422
Water
Pump
Facility,
Potable
UM = KG
Construction
Cost
Factor
(CCF)
.42/KG,
based
on
data
provided
by
USACE
and
deflated
to FY04 $
using
deflation
factor
of
0.985.
Sustainment
Cost
Factor
(SCF)
||content||
.02/KG,
the
sustainment
factor
was
calculated
using
data
from
RS
Means.