UM = EA
Construction Cost Factor (CCF)
5,086.67/EA, based on data provided from USACE and Marshall & Swift. Costs are based on
a utility building (FAC 8910) of 1,500 SF and the average cost for a 20 HP air compressor.
Sustainment Cost Factor (SCF)
,907.60/EA, the sustainment factor was calculated using data from RS Means, and the
Whitestone MARS as used for FAC 8910.
No Layout Available