MIL-HDBK-1024/1
+)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))),
*
*
*
*
MTRACON
*
*
*
*
Plumbing Requirements (GPM):
*
*
Water;
*
*
*
*
Cold
65
*
*
Hot
*
*
Recovery Rate (100 Deg. Rise)
30
*
*
Storage (Gal.)
40
*
*
Fire Protection Requirements
*
*
Not Included
*
*
*
*
Heating Requirements (BTU/HR x 1000):
*
*
(Inside Design Temperature = 72 Degs. F)
*
*
Outside Design Temperature
-5 Degs. F
110
*
*
+5 Degs. F
100
*
*
+15 Degs. F
80
*
*
+25 Degs. F
65
*
*
*
*
*
*
Based on 91 Degs. D.B.
76 Degs. W.B. Outside Design
*
*
Conditions; Cooling Load
523
*
*
*
*
Heat rejected to conditioned spaces by energized test.
*
*
Equipment & parts under repair not included.
*
*
*
*
Electrical Requirements (KVA):
*
*
Lights;
*
*
Connected Load
44.0
*
*
Estimated Demand
31.0
*
*
*
*
Power;
*
*
Connected Load
116.0
*
*
Estimated Demand
81.0
*
*
*
*
*
*
Connected Load
124.0
*
*
Estimated Demand
87.0
*
*
*
*
Total;
*
*
Connected Load
284.0
*
*
Estimated Demand
199.0
*
*
150.0
*
*
*
*
Areas (SF):
*
*
Gross area including mechanical
*
*
equipment room
13,200
*
*
*
*
*
*
*
*
/))))))))))))))))))))))))))))))))))))0)))))))))0))))))))))))))))))))0))))))))1
* TITLE
* DATE
*
* SHEET *
FACILITY PLATE
*
MTRACON Facility Design Notes * 11/92 *
* 3 OF 3 *
133-72
.))))))))))))))))))))))))))))))))))))2)))))))))2))))))))))))))))))))2))))))))-
94