MIL-HDBK-1024/1
+)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))),
*
*
Air Traffic
*
*
Control Tower
*
*
*
*
Plumbing Requirements:
*
*
Water;
*
*
*
*
Cold
G.P.M.
12
*
*
Hot
*
*
Recovery Rate (100 Degs. Rise) G.P.M.
20
*
*
Storage Gal
20
*
*
Fire Protection Requirements
*
*
Not Included
*
*
*
*
Heating Requirements (BTU/HR x 1000):
*
*
(Inside Design Temperature = 72 Degs. F)
*
*
Outside Design Temperature
-5 Degs. F
215
*
*
+5 Degs. F
185
*
*
+15 Degs. F
160
*
*
+25 Degs. F
130
*
*
*
*
*
*
Based on 91 Degs. D.B.
76 Degs. W.B. Outside Design
*
*
Conditions; Cooling Load
185
*
*
*
*
Heat rejected to conditioned spaces by energized test.
*
*
Equipment & parts under repair not included.
*
*
*
*
Electrical Requirements (KVA):
*
*
Lights;
*
*
Connected Load
12.0
*
*
Estimated Demand
11.0
*
*
*
*
Power;
*
*
Connected Load
62.0
*
*
Estimated Demand
56.0
*
*
*
*
*
*
Connected Load
13.0
*
*
Estimated Demand
12.0
*
*
*
*
Total;
*
*
Connected Load
87.0
*
*
Estimated Demand
79.0
*
*
60.0
*
*
*
*
Areas (SF):
*
*
Gross area including mechanical
*
*
equipment room
3,940
*
*
*
*
*
*
/))))))))))))))))))))))))))))))))))))0)))))))))0))))))))))))))))))))0))))))))1
* TITLE
* DATE
*
* SHEET *
FACILITY PLATE
*
* 11/92 *
* 6 OF 6 *
Air Traffic Control Tower
141-70
*
*
*
*
*
Facility Design Notes
.))))))))))))))))))))))))))))))))))))2)))))))))2))))))))))))))))))))2))))))))-
118