MIL-HDBK-1024/1
+)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))),
*
*
*
*
Base Building
*
*
*
*
Plumbing Requirements:
*
*
Water;
*
*
*
*
Cold
G.P.M.
62
*
*
Hot
*
*
Recovery Rate (100 Degs. Rise) G.P.M.
17
*
*
Storage Gal
40
*
*
Fire Protection Requirements
*
*
Not Included
*
*
*
*
Heating Requirements (BTU/HR x 1000):
*
*
(Inside Design Temperature = 70 Degs. F)
*
*
Outside Design Temperature
-5 Degs. F
95
*
*
+5 Degs. F
85
*
*
+15 Degs. F
75
*
*
+25 Degs. F
65
*
*
*
*
*
*
Based on 91 Degs. D.B.
76 Degs. W.B. Outside Design
*
*
Conditions; Cooling Load
275
*
*
*
*
Heat rejected to conditioned spaces by energized test.
*
*
Equipment & parts under repair not included.
*
*
*
*
Electrical Requirements (KVA):
*
*
Lights;
*
*
Connected Load
15
*
*
Estimated Demand
11
*
*
*
*
Power;
*
*
Connected Load
65
*
*
Estimated Demand
46
*
*
*
*
*
*
Connected Load
100
*
*
Estimated Demand
70
*
*
*
*
Total;
*
*
Connected Load
180
*
*
Estimated Demand
127
*
*
125
*
*
*
*
Areas (SF):
*
*
Gross area including mechanical
*
*
equipment room
4,320
*
*
*
*
*
*
*
*
/))))))))))))))))))))))))))))))))))))))0)))))))0))))))))))))))))))))0))))))))1
* TITLE
* DATE *
* SHEET *
FACILITY PLATE
*
Air Traffic Control Tower Base * 11/92 *
* 3 OF 3 *
141-71
*
Building Facility Design Notes *
*
*
*
.))))))))))))))))))))))))))))))))))))))2)))))))2))))))))))))))))))))2))))))))-
123