MIL-HDBK-1024/1
+)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))),
*
*
Combined Structural/Aircraft
*
*
Fire and Rescue Station
*
*
*
*
Plumbing Requirements (GPM):
*
*
Water;
*
*
*
*
Cold
80
*
*
Hot
*
*
Recovery Rate (100 Degs. Rise)
46
*
*
Storage (Gal)
140
*
*
Fire Protection Requirements
*
*
Not Included
*
*
*
*
Heating Requirements (BTU/HR x 1000):
*
*
*
*
-Aparatus Area(s)=55 Degs. F
*
*
Outside Design Temperature
-5 Degs. F
510
*
*
+5 Degs. F
430
*
*
+15 Degs. F
350
*
*
+25 Degs. F
270
*
*
*
*
*
*
Based on 91 Degs. D.B.
76 Degs. W.B. Outside Design
*
*
Conditions; Cooling Load
327
*
*
*
*
Heat rejected to conditioned spaces by energized test.
*
*
Equipment & parts under repair not included.
*
*
*
*
Electrical Requirements (KVA):
*
*
Lights;
*
*
Connected Load
67.6
*
*
Estimated Demand
23.7
*
*
*
*
Power;
*
*
Connected Load
36.6
*
*
Estimated Demand
12.8
*
*
*
*
*
*
Connected Load
195.4
*
*
Estimated Demand
68.4
*
*
*
*
Total;
*
*
Connected Load
299.6
*
*
Estimated Demand
104.9
*
*
*
*
30.0
*
*
*
*
Areas (SF):
*
*
Gross area including mechanical
*
*
equipment room
22,585
*
*
*
*
*
*
Apparatus stall depth is based on a vehicle length of 36 feet.
*
*
Increase the stall depth for longer vehicles.
/))))))))))))))))))))))))))))))))))))))))0)))))))0))))))))))))))))))0))))))))1
* TITLE
* DATE * FACILITY PLATE * SHEET *
* Combined Structural/Aircraft Fire And * 11/92 *
* 3 OF 3 *
141-25
* Rescue Station Facility Design Notes *
*
*
*
.))))))))))))))))))))))))))))))))))))))))2)))))))2))))))))))))))))))2))))))))-