MIL-HDBK-1024/1
+)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))),
*
*
*
*
*
Aircraft Fire And Rescue Station Type *
*
* Plumbing Requirements (GPM):
Class A
Class B
*
*
Water;
*
*
*
*
Cold
67
67
*
*
Hot
*
*
Recovery Rate (100 Degs. Rise)
37
37
*
*
Storage (Gal)
120
120
*
*
Fire Protection Requirements
*
*
Not Included
*
*
* Heating Requirements (BTU/Hr x 1000):
*
*
*
*
*
-Aparatus Area(s)=55 Degs. F
*
*
Outside Design Temperature
-5 Degs. F
242
295
*
*
+5 Degs. F
204
249
*
*
+15 Degs. F
167
203
*
*
+25 Degs. F
129
158
*
*
*
*
*
Based on 91 Degs. D.B.
76 Degs. W.B. Outside Design Conditions;
*
*
Cooling Load
175
195
*
*
*
*
Heat rejected to conditioned spaces by energized test.
*
*
Equipment & parts under repair not included.
*
*
* Electrical Requirements (KVA):
*
*
*
Lights;
*
*
Connected Load
31.8
35.7
*
*
Estimated Demand
11.1
12.5
*
*
*
*
Power;
*
*
Connected Load
15.7
17.6
*
*
Estimated Demand
5.5
6.2
*
*
*
*
*
*
Connected Load
83.8
94.1
*
*
Estimated Demand
29.3
32.9
*
*
*
*
Total;
*
*
Connected Load
131.3
147.4
*
*
Estimated Demand
45.9
51.6
*
*
*
20.0
20.0
*
*
* Areas (SF):
*
*
*
Gross area including mechanical
*
*
equipment room
11,660
13,140
*
*
*
*
*
Apparatus stall depth is based on a vehicle length of 36 feet.
*
*
Increase the stall depth for longer vehicles.
/))))))))))))))))))))))))))))))))))))))))0)))))))0))))))))))))))))))0))))))))1
*TITLE
* DATE * FACILITY PLATE * SHEET *
*
*
*
*
*
Aircraft Fire And Rescue Station
*
(Class A & B) Facility Design Notes* 11/92 *
* 4 OF 4 *
141-20
.))))))))))))))))))))))))))))))))))))))))2)))))))2))))))))))))))))))2))))))))-
168