UFC 4-152-01
28 July 2005
Piers and Wharves, February 1997
TR-2103-SHR, Seismic Criteria for
California Marine Pile Terminals, Vol 1 and
Vol 2, April 1999
TR-6014-OCN, Mooring Design Physical
and Empirical Data
TR-6015-OCN, Foam Filled Fender
Design to Prevent Hull Damage
TR-R-605, Reinforced Landing Float and
Brow
7. Naval Sea Systems Command,
OP5
Washington, DC
Naval Ships Technical Manual, NSTM018,
Chapter 611, Fenders and Separators,
December 2001
8. U.S. Army Corps of Engineers, Army
Ice Pressure on Engineering Structures,
Cold Regions Research Laboratory
Monogram III-B1B
9. Federal Emergency Management
Prestandrad and Commentary for the
Agency,
Seismic Rehabilitation of Buildings, FEMA
256, November 2000
10. Code of Federal Regulations
29 CFR 1917.26, First Aid and Lifesaving
Facilities
11. Americans with Disabilities Act
Accessibility Guidelines (ADAAG)
12. Uniform Federal Accessibility
Standards
13. California State Lands Commission
Marine Oil Terminal Engineering and
Maintenance Standards, June 2003
154