> Figure 8-11. Solid fill-type wharf construction with steel sheet pile bulkhead.
Figure 8-10. High-Level Open-Type Wharf Construction with Concrete Deck on Prestressed Concrete Beams-Steel Pipe Piles.
Figure 8-12. Solid fill type wharf construction with steel sheet pile bulkhead and relieving platform anchor.
Engineering and Design of Military Ports - index
Page Navigation
54
55
56
57
58
59
60
61
62
63
64
TM
5-850-1
Figure
8-11.
Solid
fill-type
wharf
construction
with
steel
sheet
pile
bulkhead.
8-14